Piling

Piling

Australian Standard Method of Measurement (ASSM):

  • Section 5
  • We use the ASSM to describe the scope for piling work as a guide only
  • Any agreed or contract scope of work will more than likely vary from the scope of work under the ASSM
  • The scope of work set out in Rawlinsons also varies from the scope of work under the ASSM
  • The ASSM often includes the same items of work under multiple Sections

Scope of work under ASSM:

  • Driven piling including piling and sheet piling
  • Cast in-situ piling including cast in-situ driven concrete piling | cast in situ bored concrete piling

Australian/New Zealand Standards:

  • AS 2159-2009 Piling Design and Installation
  • Other Standards may deal with associated or related aspects of demolition work

CIArb

Chartered Institute of Arbitrators (UK and Australia)

We have been associated with the Chartered Institute of Arbitrators (“CIArb”) since October 2011. The CIArb is located at 12 Bloomsbury Square, London.

The money chase

Taking the right legal steps...

Discover the key steps to securing your cashflow and resolving disputes.

Read more...

CIArb

Chartered Institute of Arbitrators (UK and Australia)

We have been associated with the Chartered Institute of Arbitrators (“CIArb”) since October 2011. The CIArb is located at 12 Bloomsbury Square, London.